CleanFlo cleanflo.io/templates/method-statement-template
Method Statement
Submit with the site-specific risk assessment. Together these form your RAMS.
Project and site information
- Client and site address stated
- Scope of works described specifically, not generically
- Planned start and completion dates
- Working hours agreed, including out of hours or night work
- Site contact and contractor contact named with phone numbers
- Access arrangements: entry, keys, permits, induction
- Areas in and out of scope clearly stated
- Whether the building will be occupied during the work
People and competence
- Number of operatives on site
- Supervisor named and their contact given
- Training and competence relevant to the work recorded
- Certificates available on request: PAT, IPAF, CSCS, DBS where relevant
- Site induction arrangements confirmed
- Sub-contractors named, if any, and their RAMS referenced
Equipment and substances
- Every item of equipment to be used listed
- Inspection and PAT testing status confirmed and in date
- Power requirements confirmed, including 110V where required
- Every chemical listed, with COSHH assessments attached
- Safety data sheets available on site
- Access equipment specified: steps, towers, MEWP, and who is trained on it
- Waste arrangements: which skip, or waste transfer note if removing
Sequence of work
Numbered, in order, and specific. This is the part a principal contractor actually reads.
- Arrival, sign in and induction
- Site inspection before starting; report any new hazard before work begins
- Set up exclusion zone and signage
- Isolate services if required, under permit
- Set out equipment and chemicals; check PPE
- Carry out the work in the stated sequence, area by area
- Maintain segregation from occupants and other trades throughout
- Remove waste to the agreed point progressively, not at the end
- Clean down and remove equipment
- Final inspection and handover
- Sign out and report any incident or defect
Control measures and PPE
- Hazards identified in the accompanying risk assessment, referenced not repeated
- PPE specified for each stage of the work
- Segregation from the public and other trades described
- Signage and barriers specified
- Ventilation arrangements where chemicals or dust are involved
- Working at height controls stated
- Manual handling controls stated
- Noise and vibration controls where applicable
- Housekeeping: routes kept clear throughout
Emergency arrangements
- First aid provision and the nearest first aider
- Nearest A&E and the route to it
- Accident, incident and near-miss reporting procedure
- Fire procedure, alarm and assembly point
- Spill procedure and the location of the spill kit
- Emergency stop and isolation points
- Who has authority to stop the work, and the circumstances in which they must
Sign-off
- Prepared by, with name, role, signature and date
- Reviewed and accepted by the client or principal contractor
- Briefed to every operative before work starts
- Operative briefing signatures collected and retained
- Version number recorded and superseded versions withdrawn